“Paint the walls white, two coats” is not a specification. It leaves the preparation, the products, the undercoat, the sheen and the standard of finish open to interpretation, and that is where disputes, failures and unfair quotation comparisons start. A good paint specification removes the guesswork for homeowners, developers, architects and property managers alike.
Why a specification matters
- Fair comparison of quotations. Contractors price the same preparation, products and coats, so the cheapest quotation is not simply the one that leaves the most out.
- Durability. The system is chosen for the surface and its exposure, not just the colour.
- Quality control. Everyone works to a written standard that can be inspected.
- Maintenance. Years later, you know exactly what is on each wall, which makes repainting simpler and avoids incompatible coatings.
What a good specification includes
1. Project and area schedule
A list of every area and surface to be coated: rooms, elevations, ceilings, doors, frames, metalwork and floors. Each area gets its own entry, because a kitchen wall, a bathroom ceiling and a sunny exterior elevation need different systems.
2. Surface type and condition
For each area: the substrate (for example new cement-sand plaster, previously painted plaster, timber, steel, concrete floor) and its condition, including cracks, damp, loose paint, existing coatings and anything that needs investigating first.
3. Preparation required
What must be done before any coating: cleaning, removal of loose or failing coatings, crack repair, filling or skimming, sanding, treatment of mould or salts, and for floors, mechanical grinding. Preparation is where specifications most often differ from what is actually done, so it should be explicit.
4. The coating system
The full sequence of coats for each area, not just the finish:
- primer or sealer;
- undercoat;
- finishing coats, and how many.
Where it matters, such as industrial floors and protective coatings, the specification also states the film thickness the product data sheet requires.
5. Products, or the performance required
Either named products, or the performance a product must meet (for example exterior-grade, washable, alkali-resistant, suitable for the floor’s traffic and spills). If alternatives are allowed, say how a substitute is approved. Products within one system must be compatible with each other and with the surface; using one manufacturer’s recommended system is the simplest way to ensure that.
6. Colours and sheen
The colour for each area by name and code from a recognised chart, the sheen (matt, silk, gloss or textured) and any feature walls. Colours are confirmed on a sample on the actual wall, because colours on screen and on small chips are only approximate. Our colour charts list each colour with its code.
7. Application and conditions
The method (brush, roller or spray), the conditions to avoid (rain, damp surfaces, extreme heat or humidity), and drying and recoating times taken from the product data sheets.
8. Sequence, protection and working hours
The order of work across trades, protection of floors, fittings and furniture, and any working-hour limits for occupied buildings or trading premises.
9. Inspection, hold points and acceptance
When work is inspected before the next stage starts (for example after preparation and after the undercoat), who signs it off, and what an acceptable finish looks like. A sample area or mock-up approved at the start is a useful reference for the rest of the job.
10. Handover and maintenance records
A record of the products, colours and batch details used in each area, with care and cleaning guidance, so future repairs and repainting match.
A sample specification entry
An illustrative format for one area (not a recommendation for your building):
| Item | Entry |
|---|---|
| Area | Living room walls, ground floor |
| Substrate and condition | New cement-sand plaster; dry; minor shrinkage cracks |
| Preparation | Confirm dryness; fill cracks; skim where rough; sand; dust off |
| System | Sealer or primer suitable for new plaster × 1; undercoat × 1; vinyl silk × 2 |
| Products | As per the approved system from one manufacturer’s range |
| Colour and sheen | Chart name and code; silk |
| Inspection | After skim and sanding; after undercoat; final under daylight and artificial light |
Standards and references
In the UK, BS 6150 is the code of practice for painting buildings. It covers the preparation, initial painting and maintenance of painted surfaces in buildings, inside and out. Whatever references a specification draws on, the manufacturer’s data sheet for each product remains the authority on how that product is used.
Who should write it
For a single room, a careful quotation that lists the preparation, products and coats may be enough. For a whole house, a development, an apartment block or a commercial building, a written specification pays for itself. Our paint and colour consultancy prepares specifications matched to the substrate, environment and performance needed, which your own contractor can follow or we can carry out. Our project management and quality assurance service then checks the work against it. Talk to us about a specification.
Sources
- BSI, BS 6150:2019 Painting of buildings. Code of practice (standard summary) (accessed 5 November 2026)
Product data sheets from the manufacturer take precedence over general guidance for any specific product.